The challenge
Controlling water, falls and junctions in every sensitive area.
A walk-in shower concentrates critical interfaces between substrate, waterproofing, drainage, corners and joints. An invisible mistake can compromise the entire finish.

Delivered · Walk-in shower · Residential
A complete technical intervention where the visible finish begins with what will remain hidden beneath the tiles.
The project story
The existing floor and finishes were removed to recover a sound base. This allowed the substrate and sensitive areas to be checked and rebuilt in the correct sequence.
Waterproofing, falls and drainage were addressed before the large-format tiles. Black fittings and an integrated niche then give the finished shower a precise contemporary character.
Residential project completed in Zellik, Belgium.
The challenge
A walk-in shower concentrates critical interfaces between substrate, waterproofing, drainage, corners and joints. An invisible mistake can compromise the entire finish.
Our response
The substrate was repaired, protected and prepared for large-format tiling. The linear drain, alignment and junctions were integrated into a continuous, easier-care surface.
Work completed
Technique · precision · finish
The sequence documents strip-out, preparation, waterproofing, installation and the delivered detail.
Direct follow-up
Tiago Miguel remains the client’s point of contact, coordinates useful decisions and checks sensitive areas before the substrates are closed.